Why multi-span cables are hard to track

Cables that cross many spans are usually tracked piece by piece, on paper and in spreadsheets. That is where lengths, photos, and progress get lost.

One cable, one record

In MapAll Build 360, one cable is one record, from the design to the last foot underground or on the poles.

Planning the route

  1. Import your existing design file into the Planning tool in the web portal, and the whole network appears on the map in seconds
  2. Pick the route conduit by conduit and pole by pole, across as many spans as you need, underground and aerial together
  3. Set the cable type, its stage, whether it has slack loops, and its owner, then save the plan

Installing and reporting in the field

The crew opens the job in the Rope and Cable app, and every pole and vault along the route is lined up, ready to report.

At each point they count the attachments, log the box position, and photograph the pole and the cable direction. On shared poles, that record of attachments also supports make-ready and pole attachment work.

Live progress and proof

In the office, the cable summary updates live: length, state, percentage installed, blockages, and whether the cable is looped.

One click downloads a full cable report, with photos, locations, and IDs for every pole and vault. That is the evidence an operator, or a grant program, needs to sign off the work.

Frequently asked questions

What is a cable span?

A span is a length of cable between two points, such as two poles or two vaults. A single cable can cross many spans.

Can underground and aerial sections be planned together?

Yes. In MapAll Build 360, one route can mix conduit and poles, so the whole cable is planned and tracked as one record.

How do you prove a cable has been installed?

Crews record attachments, box positions, and photos at each point along the route. The cable report brings them together with locations and IDs.

Building a fiber network?