Splicing is the step that turns a fibre design into a home that is actually connected. MapAll Mike explains what splicing is, where it goes wrong and how a digital splicing workflow fixes it.
MapAll Mike is an AI character.
What is fibre splicing?
At every joint and drop point, crews join fibres strand to strand so light can travel from the exchange into the home. Each connection has to match the plan. Get one fibre wrong and that customer stays offline.
Where splicing goes wrong
On many builds, the splicing plan lives in spreadsheets, PDFs and printouts. Crews ring the office for details, information goes missing, and the records rarely match what is in the ground.
A digital splicing workflow, step by step
- Start with the design: every cable, joint and fibre allocation sits on one geospatial map, whether it comes from your own team or a design house
- Add the splice details in the web portal: the trays, the splitters and exactly which fibre connects to which
- Send it as a splicing job straight to the crew’s tablet, with full schematics
- On site, the splicer photographs the joint, logs the splitters and every colour-coded connection, then photographs the trays and the finished joint, online or offline
- Mark the job complete and the allocated fibres flow back to the office in real time, with a full joint report ready to download
From splices to a digital twin
Every completed job adds to an as-built digital twin of the network. With our partner DFG Consulting’s interactive schematics, teams can see every connection live for planning, fault finding and analysis.
Why it matters
Accurate splicing means homes are ready to connect sooner. That brings revenue sooner for the operator, and fast, reliable broadband for the customer. For operators and constructors alike, it removes rework and phone calls from every joint.
Frequently asked questions
What is fusion splicing?
Fusion splicing joins two fibres by melting their ends together with an electric arc. It gives a permanent, low-loss joint and is the standard method on FTTH builds.
What is a splicing plan?
A splicing plan, or splice schedule, records which fibre connects to which at each joint, along with the trays and splitters. Crews follow it on site.
How do you record splicing on site?
In MapAll Build 360, the splicer logs connections and photos on a tablet, online or offline. The record syncs back to the office as soon as the job is complete.